What is dirección de obra in Spain?
Dirección de obra directs the development of building works in their technical, aesthetic, planning and environmental aspects in accordance with the design, licence and other authorisations. For works covered by Spain’s LOE, the director de obra is part of the dirección facultativa, the professional supervision team. Article 12 sets out the duties.
Duties and responsibilities
Check the starting conditions
Verify setting out and the suitability of the designed foundations and structure for the ground’s geotechnical characteristics. Identify drawings, revisions, checked points and observed differences.
Resolve issues and issue instructions
Resolve issues arising on site and record necessary instructions in the Libro de Órdenes y Asistencias. Visit minutes help with follow-up but do not automatically replace that required book.
Manage design changes
Prepare applicable modifications at the promoter’s request or with their agreement, within the relevant rules. Distinguish a proposal from an approved change and retain the versions.
Document the start, progress and closeout
Sign the setting-out or start record and completion certificate, approve interim certificates and the final account, and prepare as-built documentation as specified by the LOE.
Site supervision and execution supervision: differences
Focus
Site supervisionDevelopment of the works in accordance with the design.
Execution supervisionMaterial execution and qualitative and quantitative control.
Checks
Site supervisionSetting out and suitability of foundations and structure for the ground.
Execution supervisionSetting out, materials, execution and element placement.
Records
Site supervisionInstructions, design changes and as-built documentation.
Execution supervisionInstructions, product controls, tests and results.
Relationship
Site supervisionDuties under LOE article 12.
Execution supervisionDuties under article 13, coordinated with the director de obra.
What to check and document on each visit
- Identify the project, date, attendees and current design revision.
- Review previous actions and record what was checked rather than closing items on verbal assurances.
- Separate observed facts, instructions, proposed changes and approved decisions.
- Link each observation to its location, photo and drawing reference where applicable.
- Record owners and deadlines only where agreed, keeping unresolved details explicit.
- Review, identify the version and distribute minutes to the relevant people while maintaining required records.
Example: a difference between the design and the works
If an access level differs from the current drawing, record the point, reference and available measurement. Separate the outstanding check from any instruction issued by the competent person. A photograph of a difference is not approval of a design change.
Which record to use at each project stage
The PDF is a site visit record.
Frequently asked questions
Who may act as director de obra?
Is the director de obra the same as the site manager?
Do visit minutes replace the Libro de Órdenes?
How frequently must the site be visited?
Official sources
- BOE · LOE, article 12: director de obra
- BOE · LOE, article 11: contractor and site manager
- BOE · LOE, article 7: as-built documentation
Informational guide to building works in Spain covered by the LOE. Check the appointment, professional qualifications and rules applying to your case. This is not a substitute for professional advice.